We recommend switching to the latest versions of Edge, Firefox, Chrome or Safari. Using Internet Explorer will result in a loss of website functionality.

Scheduled runs and continuing the run after failure

Comments

1 comment

  • Avatar
    Adrian Williams

    When a Schedule is are being viewed in the Analyze directory, the 'Runs' tab lists the available runs for the schedule:

    Clicking on the 'View Details' option in the context meu for a failed run will display the 'Run Details' dialog:

    Clicking on the link for the data flow will open the run in a read only session. There should be an 'Exit and continue Run' button present in the menu bar at the right hand side:

    Clicking the button will attempt to continue to run the scheduled run from the point at which it failed.

     

    Does the user accessing the failed run have the Scheduler role?

    0
    Comment actions Permalink

Please sign in to leave a comment.