Accumulate Stored history from same job that runs multiple times
I have two jobs that runs on a daily basic, JOBA and JOBB. I want to configured JOBA to be able to run several times through the day, and JOBB to retrieve history of all the instances from JOBA that ran on the same day. Can we run a job with different cycle numbers on the same day and make the successor "JOBB" retrieve all the previous run from the same day? How ?
-
When creating a History Item, you can select which job you want to pull from, so this is possible. You'd just need to make sure you set the item to accumulate history. This article goes over it: https://support.infogix.com/hc/en-us/articles/360026781753-Accumulating-History-in-ACR-Summary
Please sign in to leave a comment.
Comments
1 comment