We recommend switching to the latest versions of Edge, Firefox, Chrome or Safari. Using Internet Explorer will result in a loss of website functionality.

How to schedule follow up run by using the "On Success, Run" property of a schedule

Comments

1 comment

  • Avatar
    Adrian Williams

    When defining a schedule you can specify the primary data flow to be run under the schedule and a follow-up data flow that is to be run on success of the primary data flow. You cannot specify another schedule as the on-success action.

     

    If you want to perform conditional execution of another data flow from within a scheduled primary data flow you could consider using the Execute Data Flow node. For instance, this could enable you to schedule the primary data flow to run every evening but specify logic in the primary data flow that only initiated the secondary data flow (via the Execute Data Node) on Monday - Friday evenings. Similarly, your custom logic in the primary data flow could check for prerequisite data (files) before deciding whether to run the secondary data flow.

    See the Help documentation for details of the Execute Data Flow node:

    https://doc.infogixsaas.com/analyze/Default.htm#e-node-help/Interfaces_and_Adapters/execute-data-flow.htm

     

    0
    Comment actions Permalink

Please sign in to leave a comment.